September 9, 2004
Spokane, WA -
September 9, 2004 - The construction program at Minera Andes' (TSX-V:
MAI and NASD OTCBB: MNEAF) Huevos Verdes gold/silver project in southern
Argentina is being supplemented with additional managerial and
technical staff and underground workers as part of a plan to accelerate
the work program. Joint venture operator Mauricio Hochschild & Cia.
Ltda. (MHC) is transitioning the joint venture company, Minera Santa
Cruz (MSC), into a mining company by proceeding to self mining in
Argentina.
MSC's plan is to hire and train its own personnel and
phase out third party mining contractors. Key personnel from MHC's mines
and headquarters in Peru are assisting in this program. The transition
of MSC into a mining company is part of a larger plan to increase
efficiency, lower costs, and accelerate the development of the
underground workings and to facilitate the studies needed to complete
the feasibility program.
Allen V. Ambrose, president of Minera
Andes, said "Higher grade gold and silver mineralization and the
discovery of additional veins at depth are among the reasons for the
accelerated work program at Huevos Verdes. MHC's commitment to the
project is evident in that they are bringing in some of their key mine
managers from Peru to ensure rapid advancement of the project. Huevos
Verdes is moving towards the road to production, and this reflects
confidence in Huevos Verdes' potential and value by a mining partner
whose operating capabilities are well established."
Employees, Equipment Added
The
employees from MHC's Peruvian operations now involved at Huevos Verdes
include managers with mine operating and supervisory expertise, and
health, safety and environmental experience. Drill and scoop operators,
roof support experts and other underground workers are also being
assigned to Huevos Verdes as additional equipment is acquired and
construction and underground development are accelerated. Employment was
over 100 people at the end of the second quarter, and is expected to
increase to over 150 in September.
MSC, an operating company
owned by Minera Andes and MHC, maintains direct operating control of
day-to-day operations at the Huevos Verdes project. Through their
respective ownership interests in MSC, Minera Andes owns 49 percent of
Huevos Verdes, and the 98,800-acre San Jose land package of which it is a
part, while MHC has a 51 percent ownership.
Mr. Ambrose said "As
Huevos Verdes becomes more advanced, additional people with specialized
skills are needed to accommodate the project's needs. Workers with
skills in various underground duties; logistics; accounting, budgeting
and control and purchasing, are being transferred from MHC's Peruvian
operations to assist the project. The local Argentine workforce is also
being hired and trained for the new jobs being created at Huevos
Verdes."
Huevos Verdes is Minera Andes' most advanced project and
is located in the San Jose project, a 98,800-acre mining district-size
property with about ten other known gold/silver targets at earlier
stages of exploration. Currently, four veins totaling about 32 km of
strike length have been identified at San Jose. Only 2.2 km of Huevos
Verdes has been drill-tested in detail, or less than half of its
presently known 5 km of strike length. The mineralization at Huevos
Verdes is open at depth and laterally.
Minera Andes is funded
with working capital of approximately US$5.3 million, as at June 30,
2004, for its exploration and underground construction programs. Minera
Andes is a mining exploration company focused on gold, silver and copper
exploration in Argentina where it holds about 200,000 hectares (500,000
acres) of mineral exploration land and co-owns the advanced stage San
Jose/Huevos Verdes gold/silver project now under construction for
possible mine production, with a feasibility study underway. Minera
Andes has also discovered an enriched copper zone at its Los Azules
property, and is acquiring other exploration targets in southern
Argentina. The Corporation presently has 70,361,490 issued and
outstanding shares.
For further information, please contact: Art
Johnson at the Spokane office, or Krister A. Kottmeier, investor
relations - Canada, at the Vancouver office. Visit our web site: www.
minandes.com
Spokane Office
111 East Magnesium Rd.,
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: mineraandes@minandes.com
Vancouver Office
Suite A1000-355 Burrard Street
Vancouver, B.C. V6C 2G8
Phone: (604) 689-7017; 877-689-7018
E-mail: ircanada@minandes.com
FORWARD-LOOKING
STATEMENT--- Although Minera Andes believes many of its properties have
promising potential, its properties are in the early stages of
exploration. None have yet been shown to contain proven or probable
mineral reserves. There can be no assurance that such reserves will be
identified on any property, or that, if identified, mineralization may
be economically extracted. In addition, Minera Andes' joint venture
partner, Mauricio Hochschild & Cia. Ltda., does not accept
responsibility for the use of project data or in the adequacy or
accuracy of this release.
CAUTIONARY NOTE TO U.S. INVESTORS CONCERNING ESTIMATES OF INFERRED RESOURCES:
This
news release uses the term "Inferred Resources." We advise U.S.
investors that while this term is recognized and required by Canadian
regulations, the SEC does not recognize it. "Inferred Resources" have a
great amount of uncertainty as to their existence, and great uncertainty
as to their economic and legal feasibility. It cannot be assumed that
all or any part of an "Inferred Resource" will ever be upgraded to a
higher category. Under Canadian rules estimates of "Inferred Resources"
may not form the basis of feasibility or other economic studies. U.S.
INVESTORS ARE CAUTIONED NOT TO ASSUME THAT PART OR ALL OF AN "INFERRED
RESOURCE" EXISTS, OR IS ECONOMICALLY OR LEGALLY MINABLE.
THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.