NYSE:
MUX

$1.67
-0.05 -2.91% Volume: 2,939,100 January 18, 2019
TSX:
MUX

$2.22
-0.07 -3.06% Volume: 262,082 January 18, 2019

Los Azules

  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • August 16, 2012 winter at Los Azules is starting to transition into spring
  • August 16, 2012 winter at Los Azules is starting to transition into spring
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • Six drills, with seven being mobilized at Los Azules.
  • Looking south at Los Azules. Two drills operating in the background.
  • Six drills, with seven being mobilized at Los Azules.