NYSE:
MUX

$1.81
+0.02 +1.12% Volume: 2,891,894 November 16, 2018
TSX:
MUX

$2.37
+0.00 +0% Volume: 110,435 November 16, 2018

Los Azules

  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • August 16, 2012 winter at Los Azules is starting to transition into spring
  • August 16, 2012 winter at Los Azules is starting to transition into spring
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • Six drills, with seven being mobilized at Los Azules.
  • Looking south at Los Azules. Two drills operating in the background.
  • Six drills, with seven being mobilized at Los Azules.