NYSE:
MUX

$1.77
+0.08 +4.73% Volume: 7,767,259 September 20, 2019
TSX:
MUX

$2.36
+0.11 +4.89% Volume: 388,876 September 20, 2019

Los Azules

  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • August 16, 2012 winter at Los Azules is starting to transition into spring
  • August 16, 2012 winter at Los Azules is starting to transition into spring
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • Six drills, with seven being mobilized at Los Azules.
  • Looking south at Los Azules. Two drills operating in the background.
  • Six drills, with seven being mobilized at Los Azules.