NYSE:
MUX

$3.21
+0.08 +2.56% Volume: 62,018 September 30, 2022
TSX:
MUX

$4.37
+0.09 +2.1% Volume: 700 September 30, 2022

Los Azules

  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • August 16, 2012 winter at Los Azules is starting to transition into spring
  • August 16, 2012 winter at Los Azules is starting to transition into spring
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • Six drills, with seven being mobilized at Los Azules.
  • Looking south at Los Azules. Two drills operating in the background.
  • Six drills, with seven being mobilized at Los Azules.