NYSE:
MUX

$1.30
+0.05 +4% Volume: 5,688,361 May 7, 2021
TSX:
MUX

$1.57
+0.05 +3.29% Volume: 274,819 May 7, 2021

Los Azules

  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • Preparations are underway for the upcoming drill season at the Los Azules Copper Project. Drilling is expected to resume in November.
  • August 16, 2012 winter at Los Azules is starting to transition into spring
  • August 16, 2012 winter at Los Azules is starting to transition into spring
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • October 2012, drilling commences
  • Six drills, with seven being mobilized at Los Azules.
  • Looking south at Los Azules. Two drills operating in the background.
  • Six drills, with seven being mobilized at Los Azules.