August 15, 2005
To Our Shareholders:
Minera Andes and its joint venture operating partner continued to make
exploration and construction progress in the second quarter of 2005 at
the San José/Huevos Verdes high-grade gold/silver project in southern
Argentina. The joint venture's goal: moving this attractive project
closer to gold/silver production and cash flow.
Completed underground workings, such as tunnels, drifts, ore passes and
other infrastructure, totaled almost 4,200 meters, compared to 3,500
meters earlier in the year. High-grade mineralized material continues to
be stockpiled on the surface. Underground production ramps have also
been designed for construction later in the year. Additional structures
are being built on the surface, as project employment rises to about
350.
Project Enlarged
Earlier this year, the size of San José/Huevos Verdes was increased
significantly when the nearby high-grade Frea gold/silver vein was added
to the project. In the second quarter, a 50-hole, 12,825-meter drilling
program located additional high-grade silver and gold which is being
added to the overall mineralized base of the Huevos Verdes project and
will be included in the project feasibility study now nearing
completion.
About 500 meters of the Frea vein has been tested along its strike
length. This zone will add significant high-grade gold/silver
mineralization to the overall project. As presently known, Frea vein
trend is about six kilometers long. The discovery of new mineralization
at Frea supplements successful ongoing work at the main Huevos Verdes
vein to locate new mineralization.
The data derived from construction, engineering and geologic exploration
and discovery are being incorporated into a project feasibility study
to determine Huevos Verdes' potential as a profitable mining operation. I
am pleased to report that Huevos Verdes is being recognized in the
financial markets as a high-quality, high-potential project. The Company
now has a letter of intent for $50 million in bank financing to
complete the project, contingent on a positive feasibility study.
Exploration
Consistently, the San José project, of which Huevos Verdes is only part,
has been characterized by its high discovery potential. Our plan is to
continue this pattern of discovery by drilling geophysical anomalies
located to the immediate northeast of the Huevos Verdes and Frea veins.
An 8,000-meter drill program began in the summer to test several,
well-defined anomalies. This program represents one more step forward in
learning about the expansive discovery potential in a project with
mining district potential.
Cordially,
MINERA ANDES INC.
Allen V. Ambrose
President