NYSE:
MUX

$9.39
+0.45 +5.03% Volume: 2,143,561 November 25, 2026
TSX:
MUX

$13.67
+0.30 +2.24% Volume: 72,205 November 26, 2026

Press Release Details

Second Quarter Letter to Shareholders

August 15, 2005
To Our Shareholders:

Minera Andes and its joint venture operating partner continued to make exploration and construction progress in the second quarter of 2005 at the San José/Huevos Verdes high-grade gold/silver project in southern Argentina. The joint venture's goal: moving this attractive project closer to gold/silver production and cash flow.

Completed underground workings, such as tunnels, drifts, ore passes and other infrastructure, totaled almost 4,200 meters, compared to 3,500 meters earlier in the year. High-grade mineralized material continues to be stockpiled on the surface. Underground production ramps have also been designed for construction later in the year. Additional structures are being built on the surface, as project employment rises to about 350.

Project Enlarged

Earlier this year, the size of San José/Huevos Verdes was increased significantly when the nearby high-grade Frea gold/silver vein was added to the project. In the second quarter, a 50-hole, 12,825-meter drilling program located additional high-grade silver and gold which is being added to the overall mineralized base of the Huevos Verdes project and will be included in the project feasibility study now nearing completion.

About 500 meters of the Frea vein has been tested along its strike length. This zone will add significant high-grade gold/silver mineralization to the overall project. As presently known, Frea vein trend is about six kilometers long. The discovery of new mineralization at Frea supplements successful ongoing work at the main Huevos Verdes vein to locate new mineralization.

The data derived from construction, engineering and geologic exploration and discovery are being incorporated into a project feasibility study to determine Huevos Verdes' potential as a profitable mining operation. I am pleased to report that Huevos Verdes is being recognized in the financial markets as a high-quality, high-potential project. The Company now has a letter of intent for $50 million in bank financing to complete the project, contingent on a positive feasibility study.

Exploration

Consistently, the San José project, of which Huevos Verdes is only part, has been characterized by its high discovery potential. Our plan is to continue this pattern of discovery by drilling geophysical anomalies located to the immediate northeast of the Huevos Verdes and Frea veins. An 8,000-meter drill program began in the summer to test several, well-defined anomalies. This program represents one more step forward in learning about the expansive discovery potential in a project with mining district potential.

Cordially,

MINERA ANDES INC.

Allen V. Ambrose
President

Recent Releases

(Opens in new window)