SPOKANE, WA - May 23, 2006 - Minera Andes (TSX-V: MAI and US OTC: MNEAF)
is pleased to report the discovery of significant high-grade copper at
its Los Azules property in Argentina. An eleven hole drill program
returned intervals up to 1.62% copper over 221 meters and 1.00% copper
over 173 meters in separate holes.
The new core drilling (see Table 1) focused on the previously defined
enriched copper target in an area approximately 2,500 meters by as much
as 1,500 meters defined by prior drilling (see attached map). Drilling
tested mineralization on both Minera Andes' lands and adjacent lands
subject to a letter of intent with Xstrata (see below).
---------------------------------------------------------------------
Table 1. Significant 2006 Drilling Results at Los Azules
---------------------------------------------------------------------
Intersection Total
TD From To Interval Copper
Drill Hole (m) (m) (m) (m) (%)
---------------------------------------------------------------------
AZ-06-10 (core) 261.35 174 261.35 87.35 0.83
---------------------------------------------------------------------
AZ-06-11 (core) 270.7 158.7 270.7 158.7 0.51
---------------------------------------------------------------------
AZ-06-14 (core) 224.55 136 178 42 1.13
Includes: 136 158 22 1.40
---------------------------------------------------------------------
AZ-06-17 (core) 183.5 66 183.5 117.65 0.63
Includes: 66 124 58 0.84
---------------------------------------------------------------------
AZ-06-19 (core) 299.4 78.25 299.4 221.15 1.62
Includes: 78.25 116 37.75 2.22
Includes: 134 146 12 3.94
---------------------------------------------------------------------
AZ-06-20 (core) 253.3 80 253.3 173.3 1.00
Includes: 80 98 18 1.69
Includes: 98 182 84 1.12
---------------------------------------------------------------------
Allen
Ambrose, president of Minera Andes, said, "Our technical team has
made a second discovery in Argentina. Our careful, consistent,
methodical exploration has now resulted in two discoveries including the
San José project now going into production and the new exciting Los
Azules drilling results. The northern portion of the Los Azules target
where the new drilling has discovered thick sections of plus one
percent copper is exciting in that we see a large copper target
developing that is near surface and high grade. We look forward to
reporting on the ongoing exploration program at this discovery later
this year when an aggressive drilling campaign will start in
Argentina's summer field season."
Eleven reconnaissance core holes totaling 3,426 meters were drilled in
the current campaign to depths of between 133 to 316 meters. The
primary focus of the drilling was to test the grade and continuity of
known leachable (chalcocite) copper mineralization identified in prior
drill campaigns (see Table 2). Drilling at Los Azules continues to
encounter features typical of many porphyry copper systems. In the
discovery zone, strongly leached cap rock extends from the subcrop to
as much as 161 meters beneath the surface followed by an enriched zone
of secondary copper mineralization (chalcocite) overlying a zone of
mixed secondary and primary (chalcopyrite) copper mineralization. The
majority of holes shown in Table 1 ended in mineralization. Drill
holes AZ-06-12, 13, 15, 16, and 18 returned lower copper values
ranging from nil to 0.5 percent copper.
---------------------------------------------------------------------
Table 2. Significant Drilling Results at Los Azules, 1998 to 2004
---------------------------------------------------------------------
Intersection Total
TD From To Interval Copper
Drill Hole (m) (m) (m) (m) (%)
---------------------------------------------------------------------
AZ-04-01 (core) 195 130 195 56 0.62
Includes: 150 192 36 0.82
---------------------------------------------------------------------
AZ-04-02 (core) 330.5 164 304 140 0.38
Includes: 164 190 26 0.47
Includes: 230 304 72 0.42
---------------------------------------------------------------------
AZ-04-04 (core) 300.8 162 282 120 0.54
Includes: 162 202 40 0.59
Includes: 236 282 46 0.64
---------------------------------------------------------------------
AZ-04-07 (core) 168.8 96 152 56 0.44
Includes: 126 152 26 0.58
---------------------------------------------------------------------
LA-04-98 (RC) 250 117 250 133 0.47
---------------------------------------------------------------------
LA-06-98 (RC) 250 61 250 189 0.44
Includes: 157 250 93 0.64
---------------------------------------------------------------------
LA-08-98 (RC) 220 77 220 143 0.55
Includes: 103 220 117 0.61
---------------------------------------------------------------------
LA-03-04 (RC) 226 94 226 132 0.40
Includes: 104 114 10 1.12
---------------------------------------------------------------------
All results have been reviewed by Brian Gavin, Minera Andes' vice
president of exploration, an appropriately qualified person as defined
by National Instrument 43-101. Minera Andes has retained the firm of
Roscoe Postle and Associates, an independent international geological
and mining consulting firm, to review the quality control and quality
assurance program on the project. A full program of check analyses and
sequential leach copper analyses is in progress.
Xstrata Agreement
Minera Andes owns a 100 percent interest in its land that makes up
the southern half of the property. The Xstrata lands (see map) are
subject to a letter of intent whereby Minera Andes has the right to earn
a 100 percent interest in Xstrata's property by spending at least
US$1.0 million on the property over the next four years, making payments
to keep the property in good standing and producing a preliminary
economic assessment (to NI 43-101 standards). If the preliminary
assessment shows the project to be potentially economically viable at a
potential production rate of 100,000 tonnes (200 million pounds) of
copper per year for 10 years then Xstrata will have a one time back-in
right to earn a fifty one percent interest in the combined properties by
making a cash payment to Minera Andes of three times Minera Andes'
expenditures on the property, completing a bankable feasibility study
within five years and assuming underlying property commitments. In the
event that the preliminary assessment does not meet the size criterion
contemplated above, Xstrata's interest would reduce to a first right of
refusal on any subsequent sale of the property. All lands that make up
the property's mineral applications are subject to a provincial mouth of
mine royalty of between zero and three percent. This royalty will be
negotiated with the province of San Juan as the project advances.
The Xstrata lands to be acquired by Minera Andes are subject to two
underlying agreements. The first agreement covering approximately 1,400
hectares has remaining payments totaling US$845,000 to acquire a 100
percent of these lands. The second agreement, covering the remainder of
the Xstrata lands contains underlying payments totaling US$410,000, a
US$1.0 million work commitment and a 25 percent buy back clause if a
feasibility study is completed within 3 years of Xstrata/Minera Andes
exercising the option to acquire the property, subject to payback to
Xstrata/Minera Andes of two times the expenditures on the property. If
the vendor buys back 5 percent or less there interest will convert to a
one percent net smelter royalty.
Minera Andes is a gold, silver and copper exploration company working
in Argentina. Minera Andes holds about 440,000 acres of mineral
exploration land in Argentina, including the co-owned San José
silver/gold project now under construction and development for planned
mine production and is acquiring other exploration targets in southern
Argentina. The Corporation presently has 151,614,776 issued and
outstanding shares.
For further information, please contact: Art Johnson at the Spokane
office, or Krister A. Kottmeier, investor relations - Canada, at the
Vancouver office. Visit our Web site: www.minandes.com
Spokane Office
111 East Magnesium Rd., Suite A
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: info@minandes.com
Vancouver Office
410-744 West Hastings Street
Vancouver, B.C. V6C 1A5
Phone: (604) 689-7017; 877-689-7018
E-mail: ircanada@minandes.com
FORWARD-LOOKING STATEMENT -The Corporation's results will be
subject to known and unknown risks and uncertainties that may cause the
Corporation's actual results in future periods to differ materially from
forecasted or anticipated results. Among those factors which could
cause actual results to differ materially are the following: the risks
inherent in mineral exploration and the mining industry, the
Corporation's needs for additional capital, and other risk factors
listed from time to time in the Corporation's public filings. In
addition, Minera Andes' joint venture partner, Mauricio Hochschild &
Cia. Ltda., does not accept responsibility for the use of project data
or the adequacy or accuracy of this release.
THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.