August 17, 2006
SPOKANE, WASHINGTON - August 17, 2006 -
Minera Andes Inc. (TSX-V: MAI and US OTC: MNEAF) is pleased to announce
that Minera Santa Cruz S.A. ("MSC"), a company owned 49% by Minera
Andes and 51% by Mauricio Hochschild & Cia. Ltda. ("MHC"), is
finalizing the terms and conditions of an offer letter accepted earlier
this year from Macquarie Bank Limited ("Macquarie Bank") (Australian
Stock Exchange, ASX: MBL). This facility will provide a limited recourse
project finance loan of up to US$55 million for completion of mine
construction at the San José silver/gold project in Argentina scheduled
for production at the end of the first quarter of 2007.
The debt
facility of up to US$55 million to be provided by Macquarie Bank is
subject, among other things, to documentation, finalization of hedging
terms and fulfillment of conditions precedent. It is anticipated that
the facility will be available for drawdown in the 4th quarter of 2006.
The facility is substantially non-recourse to Minera Andes and MHC. As
part of the overall project facility amount, there is a subordinated
portion of up to US$5million available for unanticipated cost over-runs
prior to completion and commercial production. The commercial terms of
the loan are customary for a loan of this nature and include facility
fees of 2.00% on the project loan and 3.00% on the subordinated portion
with interest rates of LIBOR + 2.85% pa for the project loan and LIBOR +
4.85% pa for the subordinated portion. A success fee of up to
US$269,500 (one percent of 49 percent of the principal amount of the
facility) is payable by Minera Andes to Xystus Limited for assisting
with the structuring and negotiation of the loan facility.
While
the final documentation is being completed we have accepted an offer
letter for an early drawdown agreement on the project loan facility for
US$20 million. This early drawdown will act as bridge financing to fund
costs of construction and development work with respect to establishing a
mine at the San José project. The early drawdown has a maximum term of
three months and is part of the larger project finance facility
described above.
The interest rate for the bridge facility will
be LIBOR + 3.00%. In addition, there is a fee of 3.0%, of which half is
refundable against the fees payable under the larger project loan.
Early
drawdown of the US$20 million from the project finance facility is
subject to completion of documentation and fulfillment of certain
conditions precedent with Macquarie Bank. These conditions include
completing certain parameters on hedging, excluding pricing. It is
anticipated that the early drawdown funds will be available before the
end of this month.
Allen Ambrose, president of Minera Andes,
said: "The early drawdown of the project loan facility allows
construction of the mine to proceed on schedule while the larger project
loan documentation is completed. In addition, the early drawdown
minimizes the need for equity financing, limits dilution to
shareholders, and allows time to set pricing on bank-required hedging."
The
Macquarie group is a diversified international provider of specialist
financial and investment banking services around the world with total
assets under management of $111 billion (as of June 30, 2006).
Headquartered in Sydney, Australia, the Macquarie group comprises
Macquarie Bank, a leading Australian investment bank and its
subsidiaries and affiliates worldwide. Macquarie Bank listed on the
Australian Stock Exchange in 1996 and is rated A (S & P) / A2
(Moody's) employing over 8,600 people in 24 countries. Macquarie Bank
has a long history of lending to the mining industry and has a strong
international presence, having advised on and/or financed comparable
projects in the Americas, Europe, Africa, Asia and Australia.
This
project loan facility and early drawdown with Macquarie Bank replaces
the previously announced loan facility on July 25, 2005 with Standard
Bank Plc and Bayerische Hypo- und Vereinsbank AG.
Minera Andes is
a gold, silver and copper exploration company working in Argentina.
Minera Andes holds about 500,000 acres of mineral exploration land in
Argentina, including the co-owned San José/Huevos Verdes silver/gold
project now under construction and development. Minera Andes has also
discovered an enriched copper zone at its Los Azules property and is
acquiring other exploration targets in southern Argentina. The
Corporation presently has 152,446,225 issued and outstanding shares.
This news is submitted by Allen V. Ambrose, President and Director of Minera Andes Inc.
For
further information, please contact: Art Johnson at the Spokane office,
or Krister A. Kottmeier, investor relations - Canada, at the Vancouver
office. Visit our Web site: www.minandes.com.
Spokane Office
111 East Magnesium Rd., Suite A
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: mineraandes@minandes.com
Vancouver Office
410 - 744 West Hastings St.
Vancouver, B.C. V6C 1A5
Phone: (604) 689-7017; 877-689-7018
E-mail: ircanada@minandes.com
FORWARD-LOOKING
STATEMENT - Although Minera Andes believes many of its properties have
promising potential, its properties are in the early stages of
exploration. None have yet been shown to contain proven or probable
mineral reserves. There can be no assurance that such reserves will be
identified on any property, or that, if identified, mineralization may
be economically extracted. There can be no assurance that the San
Jose/Huevos Verdes gold/silver project will be found to be economically
feasible or that a mine will successfully be constructed. In addition,
Minera Andes' joint venture partner, Mauricio Hochschild & Cia.
Ltda., does not accept responsibility for the use of project data or the
adequacy or accuracy of this release.
THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.