June 20, 2007
SPOKANE, WA----June 20, 2007---- Minera Andes Inc. ("Minera Andes" or the "Company")
(TSX: MAI and US OTC: MNEAF) announces that it is making a further
clarification of its news release dated June 18, 2007 discussing the
mineral reserves and resources at our San José Mine in southern
Argentina scheduled for production start up by the end of the second
quarter of 2007.
San José is owned by Minera Santa Cruz ("MSC") a
company co-owned by Minera Andes (49%) and joint venture partner and
operator Hochschild Mining plc (51%) ("Hochschild") (London Stock
Exchange, LSE: HOC). The issue centers around the newly discovered Kospi
vein, which was not included as part of the supporting mineral
resources and reserves (at the Huevos Verdes and Frea Veins) for the
2005 Feasibility Study for the San José Project. Since then, a
significant amount of diamond drilling (approximately 128 holes totaling
20,450 m) has been completed at the Kospi Vein during 2006, defining a
1,200 m long gold-silver mineralized structure, located roughly 375 m to
the northeast of the Huevos Verdes vein. A new technical report
supporting the material differences on the project, including the Kospi
Vein, since the previous technical report (November 2005) is currently
being prepared by AMEC for filing under Canada's National Instrument
43-101.
As previously stated we are comfortable that the Kospi
vein will be added to the existing "resources" at the time a new
technical report is filed in respect of the San José Mine. For mineral
resources to be converted to mineral reserves, a minimum Preliminary
Feasibility level study must be completed on the Measured or Indicated
portion of the resources that includes adequate information on mining,
processing, metallurgical, economic and other relevant factors that
demonstrate, at the time of reporting, that economic extraction can be
justified. Minera Andes clarifies our June 18, 2007 press release by
stating that the supporting Preliminary Feasibility Study level
metallurgical testwork has not yet been completed on the Kospi Vein
mineralization in support of any future reserve estimates.
The significant remaining items required to complete a technical report to NI 43-101 standards are as follows:
• AMEC is currently auditing the information on the Kospi Vein provided
by MSC to confirm their resource estimate and to allow Minera Andes to
report it according to CIM standards, and AMEC reports that they do not
anticipate any significant differences in the mineral resource
estimation procedures and methodologies that have been previously
audited by AMEC for the Feasibility Study. • Review of results from
current metallurgical testwork to confirm: amenability to a
Gravity/Float and continuous Intensive Leach Reactor (ILR) system with
direct Electrowinning and Resin Column scavenging of the leach solutions
using a modular gold and silver recovery plant manufactured by Gekko
Systems; metallurgical recoveries; and operating costs. • Review of
current mine design confirming mine recoveries, capital and operating
costs. • Review of mine life and economic analysis based on current
reserves, without the Kospi vein. • Review of near term production, not
based on the Kospi vein.
As stated in the 2005 Feasibility
Study, the existing reserves (without the Kospi Vein) support a 4.3 year
mine life at a production rate of 750 tonnes per day. The current
processing facility utilizes a Gekko system. The metallurgical testwork
in support of the Gekko System on the Huevos Verdes and Frea Veins was
completed only to a Preliminary feasibility level and not supported by
pilot plant testwork. As a result there is some risk that additional
plant modifications and commissioning time could be required to achieve
the anticipated metallurgical recovery and processing plant throughput.
Furthermore until AMEC has completed its review of the Kospi Vein
deposit and the technical report is filed on Sedar, the previously
disclosed Kospi vein mineral resources remain unverified and investors
are cautioned to factor this into their investment decision.
Minera
Andes is a gold, silver and copper exploration company working in
Argentina. The Corporation holds about 410,000 acres of mineral
exploration land in Argentina including the co-owned San José
silver/gold mine under construction for production and cash flow by
mid-2007. Minera Andes has a 49% interest in the San José Project.
Minera Andes is also exploring the Los Azules copper project in San Juan
province, where drilling is underway to define a resource. Other
exploration properties, primarily gold and silver, are being evaluated
in southern Argentina. The Corporation presently has 166,605,767 issued
and outstanding shares.
Allen V. Ambrose, Minera Andes'
President, who is an appropriately qualified person as defined by
National Instrument 43-101, has reviewed the information used in this
news release.
This news is submitted by Allen V. Ambrose, President and Director of Minera Andes Inc.
For
further information, please contact: Art Johnson at the Spokane office,
or Krister A. Kottmeier, investor relations -- Canada, at the Vancouver
office. Visit our Web site: www.minandes.com.
Spokane Office
111 East Magnesium Road; Ste. A
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: info@minandes.com
Vancouver Office
911-470 Granville Street
Vancouver, B.C. V6C 1V5
Phone: (604) 689-7017; 877-689-7018
E-mail: ircanada@minandes.com
Caution Concerning Forward-Looking Statements:
This
press release contains certain "forward-looking statements", including,
but not limited to, the statements regarding the Company's strategic
plans, evolution of mineral resources and reserves, work programs,
development plans and exploration budgets at the Company's San José
Project. Investors should be aware that the introduction of new
technology such as a Gekko system can create added risk in achieving
metallurgical performance. The forward-looking statements express, as at
the date of this press release, the Company's plans, estimates,
forecasts, projections, expectations or beliefs as to future events and
results. Forward-looking statements involve a number of risks and
uncertainties, and there can be no assurance that such statements will
prove to be accurate. Therefore, actual results and future events could
differ materially from those anticipated in such statements. Risks and
uncertainties that could cause results or future events to differ
materially from current expectations expressed or implied by the
forward-looking statements include, but are not limited to, factors
associated with fluctuations in the market price of precious metals,
mining industry risks, risks associated with foreign operations,
environmental risks and hazards, uncertainty as to calculation of
mineral reserves and other risks. In addition, Minera Andes' joint
venture partner, Hochschild Mining plc., does not accept responsibility
for the use of project data or the adequacy or accuracy of this release.
Cautionary Note to U.S. Investors:
The
United States Securities and Exchange Commission (the "SEC") permits
mining companies, in their filings with the SEC, to disclose only those
mineral deposits with "mineral reserves" that a company can economically
and legally extract or produce. We use certain terms in this press
release, such as "mineral resources", that the SEC guidelines strictly
prohibit us from including in our filings with the SEC.