June 18, 2007
SPOKANE, WA--June 18, 2007-- Minera Andes Inc. ("Minera Andes" or the "Company")
(TSX: MAI and US OTC: MNEAF) announces that it is retracting its April
10, 2007 news release and Material Change Report dated April 12, 2007.
Consequently, investors should rely upon the reserves and information
reported prior to the Company's April 10, 2007 news release that did not
include the drilled off Kospi vein. The Company is also retracting all
the disclosure in its 2006 Annual Report related to the Kospi vein. It
is Minera Andes' current expectation that the Kospi vein will be added
to the existing resources at the time a new technical report is filed in
respect of the San José Mine. However, at this point we have
insufficient data to include the Kospi vein in our resource
calculations. The San José Project is owned by Minera Santa Cruz ("MSC")
a company co-owned by Minera Andes (49%) and joint venture partner and
operator Hochschild Mining plc (51%) ("Hochschild") (London Stock
Exchange, LSE: HOC). Minera Andes understands that MSC is proposing to
undertake the necessary additional technical work to allow the Kospi
vein to be classified as a reserve.
The news release of April 10,
2007 discusses Hochschild's disclosure of the addition of new reserves
at the Kospi vein to the existing San José reserves. This disclosure of
an apparent material increase in reserves triggered the requirement for a
new Canadian National Instrument 43-101("NI 43-101") technical report
that is being completed by our independent consultants, AMEC. Based on
work required to reconcile the reserve as disclosed by Hochschild
(estimated to JORC standards) to NI 43-101 standards the Company and
AMEC are reviewing whether the Kospi vein can properly be added to the
reserves at the San José Project in compliance with the requirements of
NI 43-101, given the technical work that has been done to date.
Minera
Andes will file its new NI 43-101 technical report as soon as it is
available. However, it appears that the report will not be available by
June 25, 2007, the current deadline for completion of the report. As
soon as the report is filed, Minera Andes will issue a news release that
summarizes the report and reconciles differences between the reserves
that were referred to in its April 10, 2007 news release and the reserve
and resource figures that are supported by AMEC's independent technical
report.
Production at the San José mine is scheduled to begin at
the end of the second quarter of 2007. The November 2005 feasibility
study on the San José Project assumed the use of conventional flotation,
followed by leaching in a Merryl-Crowe plant to recover the gold and
silver. As part of optimizing the processing operations MSC decided that
the mine will use an intensive leaching reactor (ILR), in lieu of the
Merryl-Crowe plant. The ILR was chosen because of its higher recoveries
for gold and silver, better control of cyanide, and lower investment and
operating costs, all of which were determined as a result of a
comprehensive prefeasibility level metallurgical testwork undertaken in
2006. In addition, Hochschild has advised Minera Andes that they are
using successfully an ILR in one of its Peruvian operations.
Minera
Andes is a gold, silver and copper exploration company working in
Argentina. The Corporation holds about 410,000 acres of mineral
exploration land in Argentina including the co-owned San José
silver/gold mine under construction for production and cash flow by
mid-2007. Minera Andes has a 49% interest in the San José Project.
Minera Andes is also exploring the Los Azules copper project in San Juan
province, where drilling is underway to define a resource. Other
exploration properties, primarily gold and silver, are being evaluated
in southern Argentina. The Corporation presently has 166,605,767 issued
and outstanding shares.
Allen V. Ambrose, Minera Andes'
President, who is an appropriately qualified person as defined by
National Instrument 43-101, has reviewed the information used in this
news release.
This news is submitted by Allen V. Ambrose, President and Director of Minera Andes Inc.
For
further information, please contact: Art Johnson at the Spokane office,
or Krister A. Kottmeier, investor relations -- Canada, at the Vancouver
office. Visit our Web site: www.minandes.com.
Spokane Office
111 East Magnesium Road; Ste. A
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: info@minandes.com
Vancouver Office
911-470 Granville Street
Vancouver, B.C. V6C 1V5
Phone: (604) 689-7017; 877-689-7018
E-mail: ircanada@minandes.com
Caution Concerning Forward-Looking Statements:
This
press release contains certain "forward-looking statements", including,
but not limited to, the statements regarding the Company's strategic
plans, evolution of mineral resources and reserves, work programs,
development plans and exploration budgets at the Company's San José
Project. Investors should be aware that the introduction of new
technology such as ILR can create added risk in achieving metallurgical
performance. The forward-looking statements express, as at the date of
this press release, the Company's plans, estimates, forecasts,
projections, expectations or beliefs as to future events and results.
Forward-looking statements involve a number of risks and uncertainties,
and there can be no assurance that such statements will prove to be
accurate. Therefore, actual results and future events could differ
materially from those anticipated in such statements. Risks and
uncertainties that could cause results or future events to differ
materially from current expectations expressed or implied by the
forward-looking statements include, but are not limited to, factors
associated with fluctuations in the market price of precious metals,
mining industry risks, risks associated with foreign operations,
environmental risks and hazards, uncertainty as to calculation of
mineral reserves and other risks. In addition, Minera Andes' joint
venture partner, Hochschild Mining plc., does not accept responsibility
for the use of project data or the adequacy or accuracy of this release.
Cautionary Note to U.S. Investors:
The
United States Securities and Exchange Commission (the "SEC") permits
mining companies, in their filings with the SEC, to disclose only those
mineral deposits with "mineral reserves" that a company can economically
and legally extract or produce. We use certain terms in this press
release, such as "mineral resources", that the SEC guidelines strictly
prohibit us from including in our filings with the SEC.