SPOKANE, WA - September 17, 2007 -- Minera Andes Inc. (TSX: MAI and US
OTC: MNEAF) is pleased to announce a NI 43-101 Technical Report has been
filed that includes new resources discovered in 2006 on the Kospi vein
at the San José project in Santa Cruz province, southern Argentina. The
San José mine is now in the commissioning phase of start up and full
production of 750 tonnes per day (t/d) is anticipated in 5 to11 months.
The San José project is operated by Minera Santa Cruz S.A. (owned 51% by
Hochschild Mining plc ("Hochschild") (HOC.L Reuters, HOC.LN Bloomberg,
London Stock Exchange) and 49% by Minera Andes.
A new Technical Report by AMEC Americas Limited (AMEC) entitled "San
José Property San Cruz Province, Argentina NI 43-101 Technical Report",
was authored by Robert Cinits (P. Geo.), Pierre Rocque (P. Eng.),
William Colquhoun (FSAIMM), and Rodrigo Marinho (C.P.G.), appropriately
qualified person according to NI 43-101. The results from the report
indicate that the 2006 core drilling program (128 holes totaling 22,047
meters) on the Kospi vein at San José increased silver and gold
resources by 62% from the level announced in the October 2005
feasibility study. In addition, we anticipate that the 38,000-meter
exploration drilling campaign currently underway, and development of the
underground workings will further increase the mineral reserves and
resources. Under NI 43-101 inferred mineral resources cannot be included
in San José's mine life. Minera Andes intends to provide an updated
technical report that will incorporate the Kospi vein measured and
indicated resources into the mine plan once additional testwork required
to allow the mineral resources to be classified as mineral reserves has
been completed according to NI 43-101. This new report will also
classify any additional reserves and resources defined from the ongoing
exploration and underground development work on the property, and
discuss the projects mineral potential. Adding mineral reserves is key
to supporting the recently announced plans to expand production to 1,500
t/d.
Some highlights of the new AMEC Technical Report are as follows (all
amounts are expressed in U.S. dollars, unless otherwise indicated):
• Measured and indicated resources: at December 31, 2006 are: 1.8
million tonnes grading 8.33 g/t gold and 522 g/t silver. An additional
92,000 ounces of gold and 5.8 million ounces of silver, in 318,000
tonnes, grading 9.03 g/t gold and 567 g/t silver are classified as
inferred resources. The economic cutoff used to calculate the resources
is $45/t (using a price of $500 for gold and $8.50 for silver).
• Gold contained: 477,000 ounces of measured and indicated resources
• Silver contained: 29.8 million ounces of measured and indicated resources
• Mineral reserves: at April 30, 2007 are essentially unchanged from the
October 2005 feasibility study since the Kospi vein is not yet
classified as a reserve.
• Production: 750 t/day at full production
• Forecast average operating costs of: $235 per ounce of gold equivalent
• Mine life is 5.2 years -- does not include Kospi vein mineral resources
• Forecast average gold production: 58,269 ounces per year at full production
• Forecast average silver production: 3.1 million ounces per year at full production
San José Mine
The drilling completed on the San José mine at year end 2006 indicate an
increase of approximately 62% in contained gold and silver and the mine
now contains over 58.5 million silver equivalent ounces in the measured
and indicated categories (see resource tables below) plus an additional
11.4 million silver equivalent ounces in the inferred category. This
increase is primarily due to the addition of the Kospi vein to the
resource category.
The Kospi vein, discovered in 2005, is the first target that has been
converted to a resource out of several high-priority drill targets
identified on the property through early reconnaissance drilling and
surface exploration programs. Other priority targets are Odin (A and B),
Ayelen, Flor, Huevos Verdes West, Kospi 1, Kospi South, Lourdes,
Frigga, Aguas Vivas, Roadside, and Portuguese West. Though these targets
are early stage we believe that they have significant discovery
potential for gold and silver mineralization. Drilling is planned for
these targets as part of an ongoing 38,000 meter, $4 million exploration
drilling program started earlier this year.
SPOKANE, WA - September 17, 2007 -- Minera Andes Inc. (TSX: MAI and US
OTC: MNEAF) is pleased to announce a NI 43-101 Technical Report has been
filed that includes new resources discovered in 2006 on the Kospi vein
at the San José project in Santa Cruz province, southern Argentina. The
San José mine is now in the commissioning phase of start up and full
production of 750 tonnes per day (t/d) is anticipated in 5 to11 months.
The San José project is operated by Minera Santa Cruz S.A. (owned 51% by
Hochschild Mining plc ("Hochschild") (HOC.L Reuters, HOC.LN Bloomberg,
London Stock Exchange) and 49% by Minera Andes.
A new Technical Report by AMEC Americas Limited (AMEC) entitled "San
José Property San Cruz Province, Argentina NI 43-101 Technical Report",
was authored by Robert Cinits (P. Geo.), Pierre Rocque (P. Eng.),
William Colquhoun (FSAIMM), and Rodrigo Marinho (C.P.G.), appropriately
qualified person according to NI 43-101. The results from the report
indicate that the 2006 core drilling program (128 holes totaling 22,047
meters) on the Kospi vein at San José increased silver and gold
resources by 62% from the level announced in the October 2005
feasibility study. In addition, we anticipate that the 38,000-meter
exploration drilling campaign currently underway, and development of the
underground workings will further increase the mineral reserves and
resources. Under NI 43-101 inferred mineral resources cannot be included
in San José's mine life. Minera Andes intends to provide an updated
technical report that will incorporate the Kospi vein measured and
indicated resources into the mine plan once additional testwork required
to allow the mineral resources to be classified as mineral reserves has
been completed according to NI 43-101. This new report will also
classify any additional reserves and resources defined from the ongoing
exploration and underground development work on the property, and
discuss the projects mineral potential. Adding mineral reserves is key
to supporting the recently announced plans to expand production to 1,500
t/d.
Some highlights of the new AMEC Technical Report are as follows (all
amounts are expressed in U.S. dollars, unless otherwise indicated):
• Measured and indicated resources: at December 31, 2006 are: 1.8
million tonnes grading 8.33 g/t gold and 522 g/t silver. An additional
92,000 ounces of gold and 5.8 million ounces of silver, in 318,000
tonnes, grading 9.03 g/t gold and 567 g/t silver are classified as
inferred resources. The economic cutoff used to calculate the resources
is $45/t (using a price of $500 for gold and $8.50 for silver).
• Gold contained: 477,000 ounces of measured and indicated resources
• Silver contained: 29.8 million ounces of measured and indicated resources
• Mineral reserves: at April 30, 2007 are essentially unchanged from the
October 2005 feasibility study since the Kospi vein is not yet
classified as a reserve.
• Production: 750 t/day at full production
• Forecast average operating costs of: $235 per ounce of gold equivalent
• Mine life is 5.2 years -- does not include Kospi vein mineral resources
• Forecast average gold production: 58,269 ounces per year at full production
• Forecast average silver production: 3.1 million ounces per year at full production
San José Mine
The drilling completed on the San José mine at year end 2006 indicate an
increase of approximately 62% in contained gold and silver and the mine
now contains over 58.5 million silver equivalent ounces in the measured
and indicated categories (see resource tables below) plus an additional
11.4 million silver equivalent ounces in the inferred category. This
increase is primarily due to the addition of the Kospi vein to the
resource category.
The Kospi vein, discovered in 2005, is the first target that has been
converted to a resource out of several high-priority drill targets
identified on the property through early reconnaissance drilling and
surface exploration programs. Other priority targets are Odin (A and B),
Ayelen, Flor, Huevos Verdes West, Kospi 1, Kospi South, Lourdes,
Frigga, Aguas Vivas, Roadside, and Portuguese West. Though these targets
are early stage we believe that they have significant discovery
potential for gold and silver mineralization. Drilling is planned for
these targets as part of an ongoing 38,000 meter, $4 million exploration
drilling program started earlier this year.
Mineral Resources* - Measured and Indicated
Area Resources
(12/31/06) |
Grades |
Classified Resource |
Contained Ounces |
Au (g/t) |
Ag (g/t) |
Total Resource (t) |
Measured (t) |
Indicated
(t) |
Gold
(oz) |
Silver
(oz) |
Silver equivalent
(oz) |
Huevos Verdes South |
10.82 |
793 |
241,000 |
108,000 |
134,000 |
84,000 |
6,150,000 |
11,190,000 |
Huevos Verdes Cntrl. |
5.43 |
329 |
121,000 |
0 |
121,000 |
21,000 |
1,277,000 |
2,537,000 |
Huevos Verdes North |
4.66 |
393 |
194,000 |
101,000 |
93,000 |
29,000 |
2,454,000 |
4,194,000 |
Frea |
10.00 |
414 |
609,000 |
82,000 |
527,000 |
199,000 |
8,108,000 |
20,048,000 |
Kospi |
7.25 |
601 |
614,000 |
0 |
614,000 |
143,000 |
11,857,000 |
20,437,000 |
Total Project
Oct. 21, 2005 |
9.32 |
494 |
1,097,000 |
167,000 |
930,000 |
327,000 |
17,343,000 |
36,972,000 |
Total Project Dec 31, 2006 |
8.33 |
522 |
1,779,000 |
291,000 |
1,488,000 |
477,000 |
29,847,000 |
58,467,000 |
Percentage change |
|
|
+62 |
|
|
+46 |
+72 |
+58 |
*Note: Contains 100 percent of the resources, Minera Andes
ownership of the project is 49%. Resources are inclusive of reserves.
Mineral resources that are not mineral reserves do not have demonstrated
economic viability. Silver/gold equivalency 1oz gold = 60 oz silver.
At April 30th, 2007 the proven and probable mineral reserves, based
on an overall cutoff off grade of $94/t (using a price of $500/oz for
gold and $8.50/oz for silver), are 1.2 million tonnes at 7.89 g/t gold
and 417 g/t silver, containing 303,000 ounces of gold and 16,028,000
ounces of silver. The reserves also take into account marginal blocks
of ore located on the periphery of higher grade zones. The cutoff
grade for these blocks was $45/t. The marginal cutoff was defined by
the value of ore, which meets the variable costs, but not the fixed
costs. A 15% unplanned dilution and a 5% mining loss are used in the
calculation for the October 21, 2005 reserves and a 12% unplanned
dilution and 5% mining loss has been used in the April 30th, 2007
reserve calculations.
Mineral Reserves* - Proven and Probable
Area Reserves
(4/30/07) Grades Classified Reserve Contained Ounces
Au (g/t) Ag (g/t) Total Reserve
(t) Proven
(t) Probable (t) Gold
(oz) Silver
(oz) Silver Equivalent (oz )
Huevos Verdes 6.39 461 586,000 236,000 350,000 120,000 8,685,000 15,909,000
Frea 9.34 375 609,000 75,000 534,000 183,000 7,342,000 18,315,000
Kospi No Reserves
Total Project Oct. 21, 2005 7.7 406 1,160,859 174,241 986,626 288,000 15,229,000 32,515,000
Total Project
4/30/07 7.89 417 1,195,000 311,000 884,000 303,000 16,028,000 34,224,000
*Note: Contains 100 percent of the reserves, Minera Andes ownership of
the project is 49%. Silver/gold equivalency 1oz Au = 60 oz Ag.
The resource and reserve estimates are based on, 417 core holes, 31
reverse circulation holes and 2,013 samples taken from underground
workings constructed at Huevos Verdes, Frea, and Kospi. The nominal
spacing at Huevos Verdes and Frea is 35 meters along strike
(horizontally) and 50 meters vertically and at Kospi it is 40 meters by
40 meters .
The following summarizes the key assumptions, parameters and methods used in the Mineral Resource and Reserve estimates:
• Gold assays were cut to 120 g/t, 20 g/t, 80 g/t and 100 g/t at Huevos
Verdes South, Central, North and Frea, and 30 g/t at Kospi,
respectively. Silver assays were cut to 10,000 g/t, 1,000 g/t, 8,000 g/t
and 4,000 g/t at Huevos Verdes South, Central, North and Frea, and
3,500 g/t at Kospi, respectively.
• Density was assigned as an average to the three principal mineralized
zones, Huevos Verdes, Frea, and Kospi. The values used for the
estimate are 2.595 t/m3 for Huevos Verdes, 2.611 t/m3 for Frea and
Kospi.
• The geological model for both Huevos Verdes and Frea zones was
developed using a series of northeast oriented sections spaced
approximately 10 meters to 50 meters apart.
• Assays were composited to full vein-width interval.
• The estimation is done using Ordinary Kriging coupled with oriented search ellipses.
• Block grades were estimated based on interpretation of geological parameters logged in drill holes.
• Included in the mineral resource estimate at Huevos Verdes North and
South and Frea are 2,013 chip channel samples taken from the
underground workings.
The filing of this technical report on San José was triggered by
disclosure of mineral reserve and resource estimates based on the
results of the 2006 exploration drilling program in our April 10th 2007
news release. The reconciliation of the material changes between the
information reported in the news release and technical report by AMEC
describe herein are the Kospi vein mineral reserves reported in the
April 10th new release reverted back to mineral resources described in
the technical report because of the need for some additional
metallurgical testwork required to meet NI 43-101 standards. The mineral
resources in the technical report are essentially unchanged from the
April 10th new release and do not require reconciliation. The mine
life in the technical report is 5.2 years as it does not take into
account the Kospi vein resources versus 6.8 years as disclosed in the
April 10th news release where the Kospi vein is included.
Minera Andes is a gold, silver and copper exploration company working
in Argentina. The Corporation holds about 410,000 acres of mineral
exploration land in Argentina including the co-owned San José
silver/gold mine that has started initial production. Minera Andes is
also exploring the Los Azules copper project in San Juan province, where
an exploration program is underway to define a resource. Other
exploration properties, primarily silver and gold, are being evaluated
in southern Argentina. The Corporation presently has 166,717,517 shares
issued and outstanding.
Allen V. Ambrose, Minera Andes' President, who is an appropriately
"qualified person" as defined by National Instrument 43-101, has
supervised the preparation of the information in the news release.
This news is submitted by Allen V. Ambrose, President and Director of Minera Andes Inc.
For further information, please contact: Art Johnson at the Spokane
office, or Krister A. Kottmeier, investor relations -- Canada, at the
Vancouver office. Visit our Web site: www.minandes.com.
Spokane Office
111 East Magnesium Road; Ste. A
Spokane, WA 99208 USA
Phone: (509) 921-7322
E-mail: info@minandes.com
Vancouver Office
911-470 Granville Street
Vancouver, B.C. V6C 1V5
Phone: (604) 689-7017; 877-689-7018
E-mail: ircanada@minandes.com
Caution Concerning Forward-Looking Statements:
This press release contains certain "forward-looking statements",
including, but not limited to, the statements regarding the Company's
strategic plans, evolution of mineral resources and reserves, work
programs, development plans and exploration budgets at the Company's San
José Project. Investors should be aware that the introduction of new
technology such as ILR can create added risk in achieving metallurgical
performance. The forward-looking statements express, as at the date of
this press release, the Company's plans, estimates, forecasts,
projections, expectations or beliefs as to future events and results.
Forward-looking statements involve a number of risks and uncertainties,
and there can be no assurance that such statements will prove to be
accurate. Therefore, actual results and future events could differ
materially from those anticipated in such statements. In particular,
there can be no assurance that commercial production at the San José
mine will be achieved on a timely basis, or at all, that production
capacity at the San José mine will be successfully increased, that
resources and reserves at the San José mine will be increased or that
Minera Andes will successfully raise the funds necessary to maintain its
interest in the San José mine. Risks and uncertainties that could cause
results or future events to differ materially from current expectations
expressed or implied by the forward-looking statements include, but are
not limited to, factors associated with fluctuations in the market
price of precious metals, mining industry risks, risks associated with
foreign operations, the state of the capital markets, environmental
risks and hazards, uncertainty as to calculation of mineral reserves and
other risks. Reference is made to the risk factors and uncertainties
described in the Company's continuous disclosure record, a copy of which
is available under the Company's profile at www.sedar.com. In addition,
Minera Andes' joint venture partner, a subsidiary of Hochschild Mining
plc, and its affiliates do not accept responsibility for the use of
project data or the adequacy or accuracy of this release. . Similarly,
Hochschild denies any responsibility for Minera Andes's NI 43-101
Technical Report or for any of Minera Andes's Canadian securities
filings or for any information that Minera Andes has given to the
securities markets and any such responsibility is hereby disclaimed in
all respects.
Cautionary Note to U.S. Investors:
The United States Securities and Exchange Commission (the "SEC")
permits mining companies, in their filings with the SEC, to disclose
only those mineral deposits with "mineral reserves" that a company can
economically and legally extract or produce. We use certain terms in
this press release, such as "mineral resources", that the SEC guidelines