ORONTO, ONTARIO--(Marketwire - May 6, 2010) - Minera Andes Inc. (the "Corporation" or "Minera Andes") (TSX:MAI)(OTCBB:MNEAF)
is pleased to announce 12 additional, and very encouraging, drill holes
from our 100% owned Los Azules copper project in San Juan Province in
Argentina. Highlights include a step-out hole 300 meters to the
north of any previous drilling which contains 1.12% Cu over 62.5 meters
(Hole 51). The other intercepts are from in-fill drilling and confirm
the presence of an important high-grade secondary enrichment zone: 1.03%
Cu over 101 meters (Hole 53A); 0.84% Cu over 52 meters and 0.83% Cu
over 38 meters (Hole 57); 0.99% Cu over 84 meters (Hole 58); 0.90% Cu
over 74 meters (Hole 59); and, 1.04% Cu over 168.2 meters (Hole 61A).
Exploration commenced in mid-December 2009, and four diamond
drills have been operating on the project. A total of 22 diamond drill
holes were completed this season for a total of 10,007 meters. Most of
the drilling is infill drilling, although step-out holes drilled at the
north end of the existing deposit extend the mineralization further
north. The deposit remains open to the north, to the west, and at depth.
In addition, we completed 615 meters of RC drilling in three holes that
were drilled for geotechnical testing.
The objective of this field season's drilling program was to
expand the known limits of mineralization, delineate the high-grade
secondary enrichment zone and to increase the confidence level of the
existing Los Azules resource. This resource contains 922 million tonnes
grading 0.55 percent copper, equivalent to 11.2 billion pounds of
copper, based on drilling completed through 2008. Also included in this
resource is a high-grade core of 161 million tonnes grading 0.87 percent
copper, which is equivalent to 3.1 billion pounds of copper. The known
resource covers an area approximately 4 kilometers by 1 kilometer, and
is open at depth and laterally. Please refer to figure 2 for a drill
hole map.
Rob McEwen, Executive Chairman and CEO of Minera Andes commented:
"The continued success of the drilling is accomplishing
our objective of increasing the confidence level of the resource at this
world class deposit. The drilling is also continuing to define the
extent of the high-grade secondary enrichment zone. Once all drill
results have been received we will update and announce a new resource
estimate. We are extremely pleased by the results of the drilling this
season, and the project continues to look better and better as we gain
additional information."
During this field season additional geological mapping was
carried out and a state-of-the-art geophysical survey is nearly
completed. The information gained from the geological mapping and
geophysical survey will be utilized to target step-out drilling for the
next field season's drilling. Engineering work and environmental base
line studies to support a preliminary feasibility study are underway.
About Los Azules
Los Azules is a large copper porphyry system located in
western San Juan Province in a belt of porphyry copper deposits that
straddles the Chilean/Argentine border. This belt contains some of the
world's largest copper deposits, including Codelco's El Teniente and
Andina mines, Anglo American's Los Bronces mine, Antofagasta PLC's Los
Pelambres mine and Xstrata's El Pachón project, among others.
About Minera Andes
Minera Andes is an exploration company exploring for
gold, silver and copper in Argentina with three significant assets: A
49% interest in Minera Santa Cruz SA, which owns the San José Mine, a
large primary silver producer that produced 4,998,000 million oz silver
and 77,070 oz gold in 2009; 100% ownership of the Los Azules copper
deposit; and, a portfolio of exploration properties in the highly
prospective Deseado Massif region of Santa Cruz Province in southern
Argentina. Minera Andes continues to be well funded and have no bank
debt. The Corporation had $18.9 million USD in cash as at December 31,
2009.
This news release has been submitted by Jim Duff, Chief Operating Officer of the Corporation.
For further information, please contact: Jim Duff or visit our Web site: www.minandes.com.
Scientific and Technical Information:
This news release has been reviewed and
approved by Nivaldo Rojas, President of Rojas & Asociados Mining
Consultants, a mining engineer and independent consultant to the
Corporation, who is a Qualified Person as defined by National Instrument
43-101, and is responsible for oversight and review of the exploration
program at the Los Azules Project, and Bruce Davis, PhD, FAusIMM, who is
a Qualified Person as defined by National Instrument 43-101 and
responsible for the quality control for the assaying of the Los Azules
drill core. All samples were collected in accordance with industry
standards. Splits from the drill core samples were submitted to the ACME
sample preparation laboratory in Mendoza, Argentina, and then
transferred to ACME's laboratory in Santiago, Chile for fire assay and
ICP analysis. Accuracy of results is tested through the systematic
inclusion of standards, blanks and check assays.
For further information in respect of the Los Azules
project please refer to the technical report entitled "Canadian National
Instrument 43-101 Technical Report in Support of the Preliminary
Assessment on the Development of the Los Azules Project, San Juan
Province, Argentina" dated March 19, 2009, the "Los Azules Report"
prepared by Randolph P. Schneider, Robert Sim, Bruce Davis, William L.
Rose, and Scott Elfen, each of whom is "independent" of the Corporation
and a "qualified person" for the purposes of National Instrument 43-101 –
"Standards of Disclosure for Mineral Projects . This report is
available on SEDAR (www.sedar.com).
The results of the preliminary assessment referenced in this news
release are preliminary in nature and include inferred mineral resources
that are considered too speculative geologically to have the economic
considerations applied to them that would enable them to be categorized
as mineral reserves, and there is no certainty that the project as
described in the preliminary assessment will be realized. The basis for
the preliminary assessment and the qualifications and assumptions made
are set out in the Los Azules Report.
Cautionary Note to U.S. Investors:
All resource estimates reported by the
Corporation were calculated in accordance with Canadian National
Instrument 43-101 and the Canadian Institute of Mining and Metallurgy
Classification system. These standards differ significantly from the
requirements of the U.S. Securities and Exchange Commission. Mineral
resources which are not mineral reserves do not have demonstrated
economic viability.
Caution Concerning Forward-Looking Statements:
This press release contains certain
forward-looking statements and information. The forward-looking
statements and information express, as at the date of this press
release, the Corporation's plans, estimates, forecasts, projections,
expectations or beliefs as to future events and results and management's
understanding of proposed legislative changes. Forward-looking
statements involve a number of risks and uncertainties, and there can be
no assurance that such statements will prove to be accurate. Therefore,
actual results and future events could differ materially from those
anticipated in such statements. Risks and uncertainties that could cause
results or future events to differ materially from current expectations
expressed or implied by the forward-looking statements include, but are
not limited to, factors associated with fluctuations in the market
price of precious metals, mining industry risks, risks associated with
foreign operations, risks related to on-going or pending litigation,
property title, the state of the capital markets, environmental risks
and hazards, uncertainty as to calculation of mineral resources and
reserves and other risks.
Readers should not place undue reliance on
forward-looking statements or information. The Corporation undertakes no
obligation to reissue or update forward-looking statements or
information as a result of new information or events after the date
hereof except as may be required by law. See the Corporation's annual
information form for additional information on risks, uncertainties and
other factors relating to the forward-looking statements and
information. All forward-looking statements and information made in this
news release are qualified by this cautionary statement.
igure 1 – Summary of Drill Hole Results
Hole 49 (-90o)