70,000 meters completed, highlights include:
349.0 m of 0.77% Cu, including 232.0 m of 0.86% Cu (AZ23292)
382.5 m of 0.54% Cu, including 74.0 m of 0.86% Cu (AZ23277)
TORONTO, May 16, 2024 (GLOBE NEWSWIRE) -- McEwen Copper Inc.,
47.7% owned by
McEwen Mining Inc. (NYSE: MUX) (TSX: MUX), is
pleased to provide the assay results from the currently completed drill season
at the Los Azules project in Argentina. The prime objectives of this season’s
infill drilling campaign were: 1. to confirm the size and grade of the deposit
as compared to the 2023 PEA estimate and upgrade the resource categories for
the upcoming feasibility study; 2. test for extensions of mineralization
beyond the current pit shell; and 3. explore our large property package for
other mineralized areas.
Based on the assay results received to date, our first objective appears to
have been met. Initial interpretation suggests that our infill drilling will
result in an increase in Measured and Indicated resources and an overall
mineral inventory within 5% of the PEA estimate. Testing for extensions beyond
the planned pit has successfully encountered mineralization both to the north
and to the south. Primary mineralization was intercepted (202.0 m of 0.20% Cu)
over 400 meters north of last year’s deep exploration hole, confirming its
extension at depth a significant distance to the north. Exploration south of
the planned pit has intercepted the principal mineralized intrusive more than
700 meters south of previous drill intercepts and indicates that prospective
intrusives continue well to the south of the pit.
Exploration over our property has produced an intriguing target, late in the
season. Initial results of a concession-wide regional mapping and sampling
campaign have identified strong evidence of a large porphyry system 3
kilometers east of the Los Azules deposit. Porphyry-style veining and quartz
vein stockworks with copper oxide mineralization have been recognized within
this new target, with assay results pending.
Additionally, this news release covers all results from the first half of the
2023-24 drill program (see Table 1). Final results will be
published when all the geochemistry is completed.
The objective of the 2023-2024 drilling campaign is to collect all the
necessary information to support the completion of the Los Azules Feasibility
Study by early 2025. This information continues to arrive and will be
processed in the following months. Resource drilling is focused on converting
all the mineralization to be mined in the first 5 years to Measured and
Indicated resource, to increase confidence during the payback period.
Geotechnical, metallurgical, hydrogeological, exploration, and condemnation
drilling are also being performed.
Highlights
-
Hole AZ23292 returned an intercept of 349 m of 0.77% Cu (approx. true thickness). The
Enriched zone portion of this hole extends over
346 meters and includes an intercept of
232 m of 0.86% Cu.
-
Hole AZ23277 has an intercept of 382.5 m of 0.54% Cu (approx. true thickness). The
Enriched zone portion of this hole extends over
306 meters with a grade of 0.61% Cu and
includes an intercept of 74 m of
0.86% Cu.
Results
Results are summarized in two schematic cross sections (Figures 2 and 3), which include simplified interpretations of the
Overburden, Leached, Enriched and Primary zones. The Enriched mineral zone
refers to the enrichment of a copper deposit by precipitation-derived water
circulation that carries copper minerals downward through the rocks to
accumulate in a thick, often horizontal “blanket”. Immediately above the
Enriched zone is the Leached zone, from which copper was removed and
transported. Weathering and oxidation often aid in this process. Below the
Enriched zone, the Primary (or Hypogene) zone is formed by ascending
copper-rich fluids having a much deeper magmatic origin. The green line on the
sections indicates the pit floor of the 30-year pit shell from the 2023 NI
43-101 Preliminary Economic Assessment (PEA).
Figure 1 presents a plan view of the location of two
sections and the holes reported. Adjacent cross sections are located 50 m
apart from each other, starting with the lowest numbered section at the south
end of the deposit and progressing to the north.
Figure 1 – Plan View Location of Cross-sections and
Drill Holes Reported in this News Release
Figure 2 displays an intercept of
349 m grading 0.77% Cu (AZ23292) and includes
232 m grading 0.86% Cu within the Enriched
zone. This hole extends higher-grade Enriched zone mineralization in the
center of the section to the east and at depth.
Figure 2 - Section 40 - Drilling, Mineralized Zones and
30-year PEA Pit (Looking North)
Figure 3 highlights a 382.5 m interval grading 0.54% Cu (AZ23277) and
includes an interval of 74 m grading
0.86% Cu within the Enriched zone. This hole extends
higher-grade mineralization in the eastern portion of the Enriched zone to the
east and at depth.
Figure 3 - Section 52 - Drilling, Mineralized Zones and
30-year PEA Pit (Looking North)
Growing the Deposit
Exploration hole AZ23241 (Figure 4) intersected a long
interval of low-grade mineralization in the Primary Zone (202.0 m
of 0.20% Cu) and began to enter higher-grade mineralization
at the end of the hole (12.0 m of
0.44% Cu). This hole is located completely outside of
the 2023 PEA base case mineable pit shell. This hole is over 400 meters to the
north of exploration hole AZ22174, also located outside of the 2023 PEA base
case mineable pit shell, which encountered 1,052.0 m of
0.29% Cu including 480 m of
0.42% Cu (Figure 4). These intercepts
suggest that primary mineralization continues at depth a significant distance
to the north. Exploration drilling south of the deposit has extended the
presence of the early mineral porphyry more than 700 meters south of
previous drilling and well outside of the southern pit boundary. This porphyry
is host for the majority of the mineralization at Los Azules and encountering
it a significant distance farther south indicates that the deposit may also
continue in this direction. Assays for these holes are pending.
A comprehensive structural model for the deposit has been completed that will
provide a better understanding of structural controls on the deposit and aid
in future exploration work. Field verification of a previous property-wide
structural study using satellite information was carried out in January and
has refined the identification of nearby exploration targets.
Figure 4 – North-South Longitudinal Section (Looking
East) With Deep Exploration Holes to the North and Exploration Holes to the
South With Early Mineral Porphyry Shown in Red
Indications of Another Porphyry Copper System Nearby
To date, geological mapping and geochemical sampling has been focused
primarily near the Los Azules deposit and only covers roughly 40% of our large
concession. To address this limitation, a mapping and sampling campaign was
begun in December, to obtain 100% coverage of our concession.
Early results of this work have identified a large new porphyry system 3
kilometers east of Los Azules. Preliminary work has identified porphyry-style
veining and alteration, indicating the presence of a porphyry copper system.
Areas with strong quartz vein stockworking and the recognition of copper
oxides at surface add to the prospectiveness of this newly identified area
(Figure 5).
Figure 5 – Quartz Stockwork Veining and Copper Oxides
Identified at Surface in Porphyry Copper System 3 Kilometers East of
Los Azules
Table 1 summarizes copper (Cu), gold (Au) and silver
(Ag) assay results received from October 2023 to December 31, 2023.
Table 1 – Recent Los Azules Drilling Results
Hole-ID
|
Section
|
Predominant
Mineral Zone
|
From (m)
|
To (m)
|
Length (m)
|
Cu %
|
Au (g/t)
|
Ag (g/t)
|
Comment
|
AZ23238
|
50-51
|
Total
|
102.0
|
201.0
|
99.0
|
1.02
|
0.07
|
2.75
|
|
|
|
Enriched
|
102.0
|
201.0
|
99.0
|
1.02
|
0.07
|
2.75
|
|
AZ23239
|
35
|
Total
|
48.0
|
225.5
|
177.5
|
0.61
|
0.07
|
1.61
|
|
|
|
Enriched
|
48.0
|
225.5
|
177.5
|
0.61
|
0.07
|
1.61
|
Incl. 86.0m of 0.76% Cu
|
AZ23240
|
41
|
Total
|
104.0
|
224.5
|
120.5
|
0.98
|
0.11
|
1.53
|
|
|
|
Enriched
|
104.0
|
224.5
|
120.5
|
0.98
|
0.11
|
1.53
|
Incl. 112.5m of 1.04% Cu
|
AZ23241
|
71
|
Total
|
18.0
|
740.0
|
722.0
|
0.11
|
0.01
|
0.63
|
|
|
|
Enriched
|
18.0
|
300.0
|
282.0
|
0.07
|
0.01
|
0.60
|
|
|
|
Primary
|
538.0
|
740.0
|
202.0
|
0.20
|
0.01
|
0.72
|
Incl. 12.0m of 0.44% Cu
|
AZ23242
|
45
|
Total
|
86.0
|
200.0
|
114.0
|
0.92
|
0.08
|
1.77
|
|
|
|
Enriched
|
86.0
|
200.0
|
114.0
|
0.92
|
0.08
|
1.77
|
|
AZ23243
|
46
|
Total
|
82.0
|
150.0
|
68.0
|
0.53
|
0.04
|
1.26
|
|
|
|
Enriched
|
82.0
|
150.0
|
68.0
|
0.53
|
0.04
|
1.26
|
|
AZ23244A
|
43-44
|
Total
|
92.0
|
230.3
|
138.3
|
0.54
|
0.05
|
1.66
|
|
|
|
Enriched
|
92.0
|
230.3
|
138.3
|
0.54
|
0.05
|
1.66
|
Incl. 112.0m of 0.63% Cu
|
AZ23245
|
43
|
Total
|
86.0
|
220.7
|
134.7
|
0.99
|
0.06
|
1.74
|
|
|
|
Enriched
|
86.0
|
220.7
|
134.7
|
0.99
|
0.06
|
1.74
|
|
AZ23246
|
39-38
|
Total
|
123.0
|
235.1
|
112.1
|
1.04
|
0.11
|
2.34
|
|
|
|
Enriched
|
123.0
|
235.1
|
112.1
|
1.04
|
0.11
|
2.34
|
Incl. 81.1m of 1.15% Cu
|
AZ23248
|
42
|
Total
|
98.0
|
227.0
|
129.0
|
0.87
|
0.08
|
1.71
|
|
|
|
Enriched
|
98.0
|
227.0
|
129.0
|
0.87
|
0.08
|
1.71
|
Incl. 93.0m of 1.02% Cu
|
AZ23249
|
40
|
Total
|
88.0
|
219.6
|
131.6
|
0.37
|
0.05
|
1.08
|
|
|
|
Enriched
|
88.0
|
219.6
|
131.6
|
0.37
|
0.05
|
1.08
|
Incl. 52.0m of 0.46% Cu
|
AZ23250
|
38
|
Total
|
114.0
|
210.0
|
96.0
|
0.69
|
0.06
|
1.05
|
|
|
|
Enriched
|
114.0
|
210.0
|
96.0
|
0.69
|
0.06
|
1.05
|
|
AZ23251
|
56
|
Total
|
82.0
|
430.8
|
348.8
|
0.37
|
0.05
|
1.65
|
|
|
|
Enriched
|
82.0
|
198.0
|
116.0
|
0.40
|
0.03
|
1.10
|
Incl. 40.0m of 0.67% Cu
|
|
|
Primary
|
198.0
|
430.8
|
232.8
|
0.36
|
0.06
|
1.93
|
|
AZ23252
|
54
|
Total
|
86.0
|
172.1
|
86.1
|
0.52
|
0.07
|
1.22
|
|
|
|
Enriched
|
86.0
|
172.1
|
86.1
|
0.52
|
0.07
|
1.22
|
|
AZ23253
|
36
|
Total
|
96.0
|
307.0
|
211.0
|
0.28
|
0.01
|
0.35
|
|
|
|
Enriched
|
96.0
|
290.0
|
194.0
|
0.29
|
0.01
|
0.36
|
|
|
|
Primary
|
290.0
|
307.0
|
17.0
|
0.19
|
0.02
|
0.25
|
|
AZ23254
|
41
|
Total
|
147.5
|
200.0
|
52.5
|
0.27
|
0.05
|
2.23
|
|
|
|
Enriched
|
147.5
|
200.0
|
52.5
|
0.27
|
0.05
|
2.23
|
Incl. 18.5m of 0.57% Cu
|
AZ23255
|
45
|
Total
|
120.5
|
253.7
|
133.2
|
0.55
|
0.04
|
1.36
|
|
|
|
Enriched
|
120.5
|
253.7
|
133.2
|
0.55
|
0.04
|
1.36
|
Incl. 64.0m of 0.74% Cu
|
AZ23257
|
39
|
Total
|
87.0
|
202.0
|
115.0
|
0.28
|
0.04
|
1.50
|
|
|
|
Enriched
|
87.0
|
202.0
|
115.0
|
0.28
|
0.04
|
1.50
|
Incl. 24.0m of 0.60% Cu
|
AZ23258A
|
28
|
Total
|
62.0
|
347.0
|
285.0
|
0.50
|
0.05
|
0.95
|
|
|
|
Enriched
|
62.0
|
300.0
|
238.0
|
0.56
|
0.06
|
0.87
|
Incl. 142.0m of 0.63% Cu
|
|
|
Primary
|
300.0
|
347.0
|
47.0
|
0.22
|
0.03
|
1.34
|
|
AZ23259MET
|
50
|
Total
|
115.0
|
347.0
|
232.0
|
0.46
|
0.02
|
0.93
|
|
|
|
Enriched
|
115.0
|
334.0
|
219.0
|
0.48
|
0.02
|
0.96
|
Incl. 114.0m of 0.73% Cu
|
|
|
Primary
|
334.0
|
347.0
|
13.0
|
0.12
|
0.02
|
0.55
|
|
AZ23260
|
32
|
Total
|
102.0
|
313.0
|
211.0
|
0.40
|
0.03
|
1.05
|
|
|
|
Enriched
|
102.0
|
313.0
|
211.0
|
0.40
|
0.03
|
1.05
|
Incl. 56.0m of 0.71% Cu
|
AZ23261
|
33
|
Total
|
98.0
|
299.0
|
201.0
|
0.40
|
0.03
|
0.74
|
|
|
|
Enriched
|
98.0
|
299.0
|
201.0
|
0.40
|
0.03
|
0.74
|
Incl. 20.0m of 0.81% Cu
|
AZ23262
|
36
|
Total
|
98.0
|
191.0
|
93.0
|
0.45
|
0.07
|
0.79
|
|
|
|
Enriched
|
98.0
|
191.0
|
93.0
|
0.45
|
0.07
|
0.79
|
Incl. 46.0m of 0.59% Cu
|
AZ23263
|
37
|
Total
|
170.0
|
318.5
|
148.5
|
0.59
|
0.09
|
2.26
|
|
|
|
Enriched
|
170.0
|
282.0
|
112.0
|
0.64
|
0.07
|
1.77
|
|
|
|
Primary
|
282.0
|
318.5
|
36.5
|
0.47
|
0.14
|
3.77
|
|
AZ23264
|
55
|
Total
|
78.5
|
276.0
|
197.5
|
0.63
|
0.10
|
2.91
|
|
|
|
Enriched
|
78.5
|
268.0
|
189.5
|
0.64
|
0.10
|
2.93
|
Incl. 64.0m of 0.91% Cu
|
|
|
Primary
|
268.0
|
276.0
|
8.0
|
0.32
|
0.10
|
2.47
|
|
AZ23265
|
54
|
Total
|
150.2
|
281.0
|
130.8
|
0.48
|
0.06
|
1.05
|
|
|
|
Enriched
|
150.2
|
281.0
|
130.8
|
0.48
|
0.06
|
1.05
|
Incl. 77.8m of 0.57% Cu
|
AZ23267
|
29
|
Total
|
66.0
|
218.0
|
152.0
|
0.51
|
0.06
|
0.79
|
|
|
|
Enriched
|
66.0
|
218.0
|
152.0
|
0.51
|
0.06
|
0.79
|
Incl. 110m of 0.63% Cu
|
AZ23268
|
50
|
Total
|
102.0
|
249.5
|
147.5
|
0.35
|
0.02
|
1.01
|
|
|
|
Enriched
|
102.0
|
249.5
|
147.5
|
0.35
|
0.02
|
1.01
|
|
AZ23269
|
31
|
Total
|
122.0
|
222.5
|
100.5
|
0.55
|
0.05
|
1.66
|
|
|
|
Enriched
|
122.0
|
222.5
|
100.5
|
0.55
|
0.05
|
1.66
|
|
AZ23271
|
26
|
Total
|
192.0
|
393.5
|
201.5
|
0.15
|
0.01
|
0.60
|
|
|
|
Enriched
|
192.0
|
390.0
|
198.0
|
0.16
|
0.01
|
0.58
|
|
|
|
Primary
|
390.0
|
393.5
|
3.5
|
0.07
|
0.04
|
1.66
|
|
AZ23273
|
25
|
Total
|
64.0
|
289.0
|
225.0
|
0.50
|
0.08
|
1.37
|
|
|
|
Enriched
|
64.0
|
289.0
|
225.0
|
0.50
|
0.08
|
1.37
|
Incl. 120m of 0.77% Cu
|
AZ23274
|
53
|
Total
|
72.0
|
207.4
|
135.4
|
0.81
|
0.06
|
2.24
|
|
|
|
Enriched
|
72.0
|
207.4
|
135.4
|
0.81
|
0.06
|
2.24
|
|
AZ23275
|
33
|
Total
|
60.0
|
216.5
|
156.5
|
0.91
|
0.08
|
1.44
|
|
|
|
Enriched
|
60.0
|
208.0
|
148.0
|
0.93
|
0.08
|
1.44
|
Incl. 78m of 1.19% Cu
|
|
|
Primary
|
208.0
|
216.5
|
8.5
|
0.63
|
0.07
|
1.43
|
|
AZ23276
|
53
|
Total
|
104.0
|
209.8
|
105.8
|
0.38
|
0.05
|
1.21
|
|
|
|
Enriched
|
104.0
|
209.8
|
105.8
|
0.38
|
0.05
|
1.21
|
Incl. 58m of 0.57% Cu
|
AZ23277
|
52
|
Total
|
94.0
|
476.5
|
382.5
|
0.54
|
0.10
|
2.33
|
|
|
|
Enriched
|
94.0
|
400.0
|
306.0
|
0.61
|
0.11
|
2.62
|
Incl. 74m of 0.86% Cu
|
|
|
Primary
|
400.0
|
476.5
|
76.5
|
0.25
|
0.06
|
1.20
|
|
AZ23279
|
53
|
Total
|
55.8
|
192.5
|
136.7
|
0.41
|
0.06
|
2.50
|
|
|
|
Enriched
|
55.8
|
192.5
|
136.7
|
0.41
|
0.06
|
2.50
|
|
AZ23280
|
56
|
Total
|
34.0
|
485.5
|
451.5
|
0.33
|
0.05
|
1.72
|
|
|
|
Enriched
|
34.0
|
485.5
|
451.5
|
0.33
|
0.05
|
1.72
|
Incl. 80m of 0.56% Cu
|
AZ23282A
|
30
|
Total
|
166.0
|
354.5
|
188.5
|
0.15
|
0.00
|
0.40
|
|
|
|
Enriched
|
166.0
|
354.5
|
188.5
|
0.15
|
0.00
|
0.40
|
|
AZ23283
|
25
|
Total
|
165.0
|
342.5
|
177.5
|
0.70
|
0.06
|
1.82
|
|
|
|
Enriched
|
165.0
|
342.5
|
177.5
|
0.70
|
0.06
|
1.82
|
Incl. 112m of 0.91% Cu
|
AZ23284
|
27
|
Total
|
55.3
|
264.8
|
209.5
|
0.52
|
0.11
|
1.37
|
|
|
|
Enriched
|
55.3
|
236.0
|
180.7
|
0.54
|
0.11
|
1.36
|
Incl. 112m of 0.67% Cu
|
|
|
Primary
|
236.0
|
264.8
|
28.8
|
0.44
|
0.09
|
1.46
|
|
AZ23285
|
59
|
Total
|
90.0
|
256.6
|
166.6
|
0.10
|
0.01
|
0.64
|
|
|
|
Enriched
|
90.0
|
174.0
|
84.0
|
0.14
|
0.01
|
0.68
|
|
|
|
Primary
|
174.0
|
256.6
|
82.6
|
0.08
|
0.00
|
0.59
|
|
AZ23286
|
48
|
Total
|
143.2
|
329.0
|
185.8
|
0.09
|
0.02
|
0.68
|
|
|
|
Enriched
|
143.2
|
258.0
|
114.8
|
0.08
|
0.02
|
0.86
|
|
|
|
Primary
|
258.0
|
329.0
|
71.0
|
0.11
|
0.02
|
0.38
|
|
AZ23289
|
49
|
Total
|
152.0
|
278.0
|
126.0
|
0.73
|
0.06
|
2.76
|
|
|
|
Enriched
|
152.0
|
278.0
|
126.0
|
0.73
|
0.06
|
2.76
|
|
AZ23290
|
51
|
Total
|
136.0
|
260.1
|
124.1
|
0.53
|
0.05
|
1.63
|
|
|
|
Enriched
|
136.0
|
260.1
|
124.1
|
0.53
|
0.05
|
1.63
|
|
AZ23291
|
47
|
Total
|
102.0
|
241.5
|
139.5
|
0.67
|
0.06
|
3.26
|
|
|
|
Enriched
|
102.0
|
241.5
|
139.5
|
0.67
|
0.06
|
3.26
|
Incl. 60m of 0.89% Cu
|
AZ23292
|
40
|
Total
|
114.0
|
463.0
|
349.0
|
0.77
|
0.10
|
2.11
|
|
|
|
Enriched
|
114.0
|
460.0
|
346.0
|
0.77
|
0.10
|
2.09
|
Incl. 232m of 0.86% Cu
|
|
|
Primary
|
460.0
|
463.0
|
3.0
|
0.72
|
0.30
|
3.93
|
|
AZ23293
|
44
|
Total
|
73.0
|
382.7
|
309.7
|
0.28
|
0.03
|
1.99
|
|
|
|
Enriched
|
73.0
|
218.0
|
145.0
|
0.38
|
0.06
|
3.57
|
Incl. 56m of 0.66% Cu
|
|
|
Primary
|
218.0
|
382.7
|
164.7
|
0.20
|
0.01
|
0.60
|
|
AZ23294
|
30
|
Total
|
90.0
|
218.0
|
128.0
|
0.41
|
0.15
|
6.78
|
|
|
|
Enriched
|
90.0
|
218.0
|
128.0
|
0.41
|
0.15
|
6.78
|
Incl. 16m of 0.74% Cu
|
AZ23297A
|
47
|
Total
|
74.0
|
360.5
|
286.5
|
0.42
|
0.05
|
1.35
|
|
|
|
Enriched
|
74.0
|
360.5
|
286.5
|
0.42
|
0.05
|
1.35
|
Incl. 26m of 0.73% Cu
|
AZ23298
|
5a
|
Total
|
294.0
|
600.5
|
306.5
|
0.16
|
0.03
|
1.29
|
|
|
|
Enriched
|
294.0
|
396.0
|
102.0
|
0.20
|
0.03
|
0.66
|
|
|
|
Primary
|
396.0
|
600.5
|
204.5
|
0.15
|
0.03
|
1.61
|
|
AZ23299B
|
23
|
Total
|
94.0
|
310.0
|
216.0
|
0.21
|
0.25
|
1.41
|
|
|
|
Enriched
|
94.0
|
254.0
|
160.0
|
0.24
|
0.31
|
1.71
|
|
|
|
Primary
|
254.0
|
310.0
|
56.0
|
0.12
|
0.07
|
0.56
|
|
AZ23300
|
42
|
Total
|
102.0
|
241.0
|
139.0
|
1.01
|
0.08
|
2.43
|
|
|
|
Enriched
|
102.0
|
241.0
|
139.0
|
1.01
|
0.08
|
2.43
|
|
AZ23301
|
40
|
Total
|
188.0
|
398.0
|
210.0
|
0.18
|
0.02
|
0.81
|
|
|
|
Enriched
|
188.0
|
398.0
|
210.0
|
0.18
|
0.02
|
0.81
|
|
AZ23303
|
30
|
Total
|
106.0
|
285.0
|
179.0
|
0.53
|
0.05
|
5.48
|
|
|
|
Enriched
|
106.0
|
234.0
|
128.0
|
0.62
|
0.07
|
7.16
|
Incl. 92m of 0.78% Cu
|
|
|
Primary
|
234.0
|
285.0
|
51.0
|
0.31
|
0.01
|
1.27
|
|
AZ23304
|
44
|
Total
|
134.0
|
387.5
|
253.5
|
0.17
|
0.02
|
0.58
|
|
|
|
Enriched
|
134.0
|
387.5
|
253.5
|
0.17
|
0.02
|
0.58
|
|
AZ23306
|
40
|
Total
|
172.0
|
476.0
|
304.0
|
0.45
|
0.05
|
1.34
|
|
|
|
Enriched
|
172.0
|
476.0
|
304.0
|
0.45
|
0.05
|
1.34
|
|
AZ23307
|
55
|
Total
|
134.0
|
184.8
|
50.8
|
0.18
|
0.03
|
0.52
|
|
|
|
Enriched
|
134.0
|
184.8
|
50.8
|
0.18
|
0.03
|
0.52
|
|
AZ23309
|
28
|
Total
|
88.0
|
299.0
|
211.0
|
0.45
|
0.03
|
1.13
|
|
|
|
Enriched
|
88.0
|
266.0
|
178.0
|
0.49
|
0.03
|
1.22
|
Incl. 26m of 0.92% Cu
|
|
|
Primary
|
266.0
|
299.0
|
33.0
|
0.22
|
0.04
|
0.69
|
|
AZ23310
|
26
|
Total
|
74.0
|
369.6
|
295.6
|
0.20
|
0.03
|
0.83
|
|
|
|
Enriched
|
74.0
|
369.6
|
295.6
|
0.20
|
0.03
|
0.83
|
|
AZ23311
|
44
|
Total
|
94.0
|
513.0
|
419.0
|
0.40
|
0.03
|
1.12
|
|
|
|
Enriched
|
94.0
|
276.0
|
182.0
|
0.39
|
0.01
|
0.38
|
Incl. 52m of 0.54% Cu
|
|
|
Primary
|
276.0
|
513.0
|
237.0
|
0.40
|
0.04
|
1.69
|
Incl. 66m of 0.79% Cu
|
AZ23312
|
55
|
Total
|
114.0
|
212.5
|
98.5
|
0.36
|
0.02
|
0.50
|
|
|
|
Enriched
|
114.0
|
194.0
|
80.0
|
0.41
|
0.02
|
0.55
|
Incl. 26m of 0.74% Cu
|
|
|
Primary
|
194.0
|
212.5
|
18.5
|
0.15
|
0.02
|
0.28
|
|
AZ23314
|
37
|
Total
|
102.0
|
316.5
|
214.5
|
0.64
|
0.06
|
1.10
|
|
|
|
Enriched
|
102.0
|
300.0
|
198.0
|
0.66
|
0.06
|
1.12
|
Incl. 84m of 0.89% Cu
|
|
|
Primary
|
300.0
|
316.5
|
16.5
|
0.36
|
0.05
|
0.81
|
|
AZ23315
|
37
|
Total
|
72.0
|
206.4
|
134.4
|
0.32
|
0.10
|
1.84
|
|
|
|
Enriched
|
72.0
|
206.4
|
134.4
|
0.32
|
0.10
|
1.84
|
Incl. 72.4m of 0.57% Cu
|
Technical information
The technical content of this press release has been reviewed and approved by
Darren King, Director of Exploration of McEwen Copper, who serves as the
qualified person (QP) under the definitions of National Instrument 43-101.
All samples were collected in accordance with generally accepted industry
standards. Drill core samples, usually taken at 2 m intervals, were split and
submitted to the Alex Stewart International laboratory located in the Province
of Mendoza, Argentina, for the following assays: gold determination using fire
fusion assay and an atomic absorption spectroscopy finish (Au4-30); a 39
multi-element suite using ICP-OES analysis (ICP-AR 39); copper content
determination using a sequential copper analysis (Cu-Sequential LMC-140). An
additional 19-element analysis (ICP-ORE) was performed for samples with high
sulphide content and that exceeded the limits of the ICP-OES analysis.
The company conducts a Quality Assurance/Quality Control program in accordance
with NI 43-101 and industry best practices using a combination of standards
and blanks on approximately one out of every 25 samples. Results are monitored
as final certificates are received, and any re-assay requests are sent back
immediately. Pulp and preparation sample analyses are also performed as part
of the QAQC process. Approximately 5% of the sample pulps are sent to a
secondary laboratory for control purposes. In addition, the laboratory
performs its own internal QAQC checks, with results made available on
certificates for Company review.
Table 2 – Hole Locations and Lengths for Los Azules
Drilling Results
HOLE-ID
|
Azimuth
|
Dip
|
Length
|
Loc X
|
Loc Y
|
Loc Z
|
AZ23238
|
205
|
-71
|
201.00
|
2383108.93
|
6559892.69
|
3618.48
|
AZ23239
|
90
|
-73
|
225.50
|
2383291.79
|
6559109.63
|
3638.32
|
AZ23240
|
250
|
-70
|
224.50
|
2383349.87
|
6559430.59
|
3635.63
|
AZ23241
|
250
|
-70
|
740.00
|
2382746.14
|
6560826.06
|
3653.29
|
AZ23242
|
257
|
-72
|
200.00
|
2383341.59
|
6559657.16
|
3634.88
|
AZ23243
|
47
|
-80
|
150.00
|
2383312.1
|
6559713.31
|
3627.57
|
AZ23244A
|
250
|
-75
|
230.30
|
2383422.55
|
6559609.27
|
3664.48
|
AZ23245
|
270
|
-73
|
220.70
|
2383360.72
|
6559558.82
|
3637.93
|
AZ23246
|
236
|
-69
|
235.10
|
2383377.45
|
6559341.84
|
3639.54
|
AZ23248
|
242
|
-72
|
227.00
|
2383367.74
|
6559510.9
|
3638.59
|
AZ23249
|
248
|
-74
|
219.60
|
2382962.63
|
6559241.34
|
3638.21
|
AZ23250
|
238
|
-74
|
210.00
|
2383217.21
|
6559241.98
|
3631.86
|
AZ23251
|
250
|
-80
|
430.75
|
2383008.71
|
6560126.27
|
3626.21
|
AZ23252
|
216
|
-70
|
172.10
|
2382956.7
|
6560008.3
|
3617.5
|
AZ23253
|
70
|
-77
|
307.00
|
2383018.5
|
6559063.1
|
3655.9
|
AZ23254
|
251
|
-68
|
200.00
|
2383490.5
|
6559498.8
|
3682.1
|
AZ23255
|
70
|
-76
|
253.70
|
2383341.6
|
6559657.1
|
3646.8
|
AZ23257
|
60
|
-70
|
202.00
|
2383376.7
|
6559342.8
|
3650.5
|
AZ23258A
|
250
|
-74
|
83.00
|
2383557
|
6558832
|
3663.9
|
AZ23259MET
|
250
|
-74
|
347.00
|
2382844.65
|
6559742.72
|
3604.22
|
AZ23260
|
250
|
-83
|
313.00
|
2383256.27
|
6558935.42
|
3666.58
|
AZ23261
|
250
|
-72
|
299.00
|
2383310.44
|
6559019.34
|
3645.87
|
AZ23262
|
54
|
-85
|
191.00
|
2383383.41
|
6559180.01
|
3642.08
|
AZ23263
|
250
|
-68
|
318.50
|
2383451.34
|
6559272.72
|
3647.94
|
AZ23264
|
70
|
-75
|
276.00
|
2382965.36
|
6560055.22
|
3611.83
|
AZ23265
|
70
|
-74
|
281.00
|
2383082.7
|
6560043.5
|
3628.43
|
AZ23267
|
246
|
-67
|
218.00
|
2383570.34
|
6558891.55
|
3657.03
|
AZ23268
|
70
|
-72
|
249.50
|
2383155.92
|
6559856.86
|
3620.7
|
AZ23269
|
50
|
-70
|
222.50
|
2383305.74
|
6558902.25
|
3658.88
|
AZ23271
|
250
|
-73
|
393.50
|
2383765.83
|
6558804.49
|
3697.56
|
AZ23273
|
250
|
-73
|
289.00
|
2383435.28
|
6558680.31
|
3666.67
|
AZ23274
|
70
|
-69
|
207.40
|
2382936.99
|
6559938.48
|
3600.47
|
AZ23275
|
270
|
-68
|
216.50
|
2383441.31
|
6559053.13
|
3649.14
|
AZ23276
|
250
|
-73
|
209.80
|
2383236.54
|
6560054.57
|
3638.55
|
AZ23277
|
250
|
-76
|
476.50
|
2383155.65
|
6559962.6
|
3624.46
|
AZ23279
|
250
|
-69
|
192.50
|
2383096.12
|
6559997.05
|
3621.08
|
AZ23280
|
70
|
-80
|
485.50
|
2382886.31
|
6560080.64
|
3604.87
|
AZ23282A
|
70
|
-77
|
354.50
|
2383640.7
|
6558970
|
3670.87
|
AZ23283
|
70
|
-73
|
342.50
|
2383333.26
|
6558591.57
|
3672.27
|
AZ23284
|
218
|
-72
|
264.80
|
2383478.28
|
6558753.12
|
3656.6
|
AZ23285
|
189
|
-73
|
256.60
|
2382660.09
|
6560140.26
|
3592.24
|
AZ23286
|
250
|
-71
|
329.00
|
2383559.06
|
6559895.32
|
3663.26
|
AZ23289
|
232
|
-69
|
278.00
|
2383144.1
|
6559821.65
|
3618.66
|
AZ23290
|
250
|
-69
|
260.10
|
2383018.48
|
6559838.85
|
3609.93
|
AZ23291
|
256
|
-61
|
241.50
|
2383211.83
|
6559701.44
|
3619.15
|
AZ23292
|
250
|
-79
|
463.00
|
2383366.47
|
6559401.53
|
3637.6
|
AZ23293
|
250
|
-79
|
382.70
|
2382848.48
|
6559430.82
|
3629.84
|
AZ23294
|
70
|
-73
|
218.00
|
2382951.62
|
6558714.14
|
3677.95
|
AZ23297A
|
90
|
-67
|
360.50
|
2383321.5
|
6559783.34
|
3626.56
|
AZ23298
|
250
|
-70
|
600.50
|
2383827.28
|
6557218.92
|
3837.42
|
AZ23299B
|
56
|
-73
|
310.00
|
2383214.16
|
6558423.55
|
3683.88
|
AZ23300
|
250
|
-73
|
241.00
|
2383411.5
|
6559520.86
|
3651.4
|
AZ23301
|
250
|
-80
|
398.00
|
2383641.55
|
6559506.34
|
3719.38
|
AZ23303
|
70
|
-73
|
285.00
|
2382745.01
|
6558655.69
|
3744.74
|
AZ23304
|
250
|
-76
|
387.50
|
2383619.16
|
6559706.95
|
3704.2
|
AZ23306
|
250
|
-80
|
476.00
|
2383532.54
|
6559463.46
|
3689.28
|
AZ23307
|
127
|
-65
|
184.80
|
2383162.23
|
6560107.98
|
3662.57
|
AZ23309
|
250
|
-75
|
299.00
|
2383384.57
|
6558763.83
|
3663.04
|
AZ23310
|
63
|
-74
|
369.60
|
2383203.62
|
6558579.65
|
3671.41
|
AZ23311
|
70
|
-73
|
513.00
|
2382847.94
|
6559431.92
|
3629.79
|
AZ23312
|
70
|
-76
|
212.50
|
2383168.16
|
6560109.28
|
3662.59
|
AZ23314
|
70
|
-73
|
316.50
|
2383163.31
|
6559169.16
|
3652.25
|
AZ23315
|
70
|
-71
|
206.40
|
2383220.02
|
6559188.86
|
3642.63
|
Coordinates listed in Table 2 based on Gauss Kruger - POSGAR 94 Zone 2
|
|
ABOUT MCEWEN COPPER
McEwen Copper is a well-funded, private company which owns 100% of the large,
advanced-stage Los Azules copper project, located in the San Juan province,
Argentina. McEwen Copper is a 47.7%-owned private subsidiary of McEwen Mining,
which has the ticker MUX on NYSE and TSX.
Los Azules is being designed to be distinctly different from a conventional
copper mine, consuming significantly less water, emitting much lower carbon
and progressing towards carbon neutral by 2038, and being powered by 100%
renewable electricity once in operation. In June 2023, an updated Preliminary
Economic Assessment (PEA) was released, which projects a long life of mine,
short payback period, low production cost per pound, high annual copper
production and a 21.2% after-tax IRR.
ABOUT MCEWEN MINING
McEwen Mining is a gold and silver producer with operations in Nevada, Canada,
Mexico and Argentina. McEwen Mining also holds a 47.7% interest in McEwen
Copper, which is developing the large, advanced-stage Los Azules copper
project in Argentina. The Company’s goal is to improve the productivity and
life of its assets with the objective of increasing the share price and
providing a yield. Rob McEwen, Chairman and Chief Owner, has a personal
investment in the companies of US$220 million. His annual salary is US$1.
CAUTION CONCERNING FORWARD-LOOKING STATEMENTS
This news release contains certain forward-looking statements and information,
including "forward-looking statements" within the meaning of the Private
Securities Litigation Reform Act of 1995. The forward-looking statements and
information expressed, as at the date of this news release, McEwen Mining
Inc.'s (the "Company") estimates, forecasts, projections, expectations or
beliefs as to future events and results. Forward-looking statements and
information are necessarily based upon a number of estimates and assumptions
that, while considered reasonable by management, are inherently subject to
significant business, economic and competitive uncertainties, risks and
contingencies, and there can be no assurance that such statements and
information will prove to be accurate. Therefore, actual results and future
events could differ materially from those anticipated in such statements and
information. Risks and uncertainties that could cause results or future events
to differ materially from current expectations expressed or implied by the
forward-looking statements and information include, but are not limited to,
effects of the COVID-19 pandemic, fluctuations in the market price of precious
metals, mining industry risks, political, economic, social and security risks
associated with foreign operations, the ability of the corporation to receive
or receive in a timely manner permits or other approvals required in
connection with operations, risks associated with the construction of mining
operations and commencement of production and the projected costs thereof,
risks related to litigation, the state of the capital markets, environmental
risks and hazards, uncertainty as to calculation of mineral resources and
reserves, and other risks. Readers should not place undue reliance on
forward-looking statements or information included herein, which speak only as
of the date hereof. The Company undertakes no obligation to reissue or update
forward-looking statements or information as a result of new information or
events after the date hereof except as may be required by law. See McEwen
Mining's Annual Report on Form 10-K for the fiscal year ended December 31,
2023, and other filings with the Securities and Exchange Commission, under the
caption "Risk Factors", for additional information on risks, uncertainties and
other factors relating to the forward-looking statements and information
regarding the Company. All forward-looking statements and information made in
this news release are qualified by this cautionary statement.
The NYSE and TSX have not reviewed and do not accept responsibility for the
adequacy or accuracy of the contents of this news release, which has been
prepared by the management of McEwen Mining Inc.
Want News Fast?
Subscribe to our email list by clicking
here:
https://www.mcewenmining.com/contact-us/#section=followUs
and receive news as it happens!!
Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/33c694f2-b6ae-456d-a566-32248720fdce
https://www.globenewswire.com/NewsRoom/AttachmentNg/16722842-96dd-4a47-beac-2263e2b7337a
https://www.globenewswire.com/NewsRoom/AttachmentNg/8146c956-b3b7-446f-a436-9f7bf9c98461
https://www.globenewswire.com/NewsRoom/AttachmentNg/23733c85-b899-4512-a8b4-5fc735c5f6bb
https://www.globenewswire.com/NewsRoom/AttachmentNg/fcde6690-9948-4c5a-b459-d2cac0c41ebd
Figure 1 – Plan View Location of Cross-sections and Drill Holes Reported
in this News Release
Figure 1 – Plan View Location of Cross-sections and Drill Holes Reported
in this News Release
Figure 2 - Section 40 - Drilling, Mineralized Zones and 30-year PEA Pit
(Looking North)
Figure 2 - Section 40 - Drilling, Mineralized Zones and 30-year PEA Pit
(Looking North)
Figure 3 - Section 52 - Drilling, Mineralized Zones and 30-year PEA Pit
(Looking North)
Figure 3 - Section 52 - Drilling, Mineralized Zones and 30-year PEA Pit
(Looking North)
Figure 4 – North-South Longitudinal Section (Looking East) With Deep
Exploration Holes to the North and Exploration Holes to the South With
Early Mineral Porphyry Shown in Red
Figure 4 – North-South Longitudinal Section (Looking East) With Deep
Exploration Holes to the North and Exploration Holes to the South With
Early Mineral Porphyry Shown in Red
Figure 5 – Quartz Stockwork Veining and Copper Oxides Identified at
Surface in Porphyry Copper System 3 Kilometers East of Los Azules
Figure 5 – Quartz Stockwork Veining and Copper Oxides Identified at
Surface in Porphyry Copper System 3 Kilometers East of Los Azules
Source: McEwen Mining